• Home
  • Calendar
  • ISS
    • Expedition 36
    • Expedition 35
    • ISS Mission Archive
  • MSL
    • MSL Mission Updates 6
    • MSL Science Reports
    • MSL Rover Information
    • MSL Science Instruments
    • MSL Gallery
  • Juno
    • Juno Mission Updates 2013
  • NuSTAR
    • NuSTAR Mission Updates
  • RBSP
    • RBSP Mission Updates
  • IRIS
    • IRIS Mission Updates
    • IRIS Spacecraft and Instruments
    • IRIS Mission Design
    • IRIS Science Overview
  • Commercial
    • Arianespace>
      • Ariane 5
      • Soyuz Kourou
      • Vega
    • SpaceX
    • United Launch Alliance
    • Orbital Sciences
    • International Launch Services
    • Sea Launch Missions
    • CCDev
  • Russia
  • China
  • Japan
  • Entry
    • Re-Entry May 2013
  • Other
    • Launch Vehicle Library
    • India
    • NPP
    • Shuttle Retirement Updates 3
    • Shuttle
    • SLS Orion
    • Phobos Grunt
  • Archive
  • Search
  • About
Share |

Soyuz FG Generic Countdown Timeline

Time Event
L-34:00:00 Tanking Preparations
L-08:00:00 Final Countdown commences
  Soyuz Systems Checks
L-06:00:00 Battery Installation in Booster
L-05:30:00 Sate Commission Meeting
L-05:15:00 Crew Arrives at Site 254
L-05:00:00 Propellant Loading
L-04:20:00 Crew dons Sokol Suits
L-04:00:00 Liquid Oxygen loading complete
L-03:40:00 Crew reports to Delegations
L-03:00:00 Tank Cars depart
L-02:40:00 Crew arrives at Launch Site
L-02:30:00 Crew Ingress
L-02:00:00 Hatch Closure
L-01:45:00 Sokol Air Flow Initiation
  Soyuz Spacecraft pressurization
  Soyuz Systems Checks
  Launcher Systems Checks
L-01:30:00 Internal Soyuz Hatch Pressure Checks
  Communication System Activation
L-01:00:00 Guidance System Acitvation
  Launch Pad Evacuation
L-00:45:00 Flight Computer Software Load
  Service Tower Retraction (Service Structure Halves)
   
L-00:40:00 Sokol Pressure Verification
L-00:30:00 Launch Command Power Activation
  SAS Launch Abort System Activation
L-00:25:00 Removal of Service Towers
L-00:15:00 Sokol Checks complete
  Launch Pad clear
  Escape System in Auto Mode
L-00:10:00 Inertial Guidance System Activation
  On-Board Recorders activated
L-00:06:00 COUNTDOWN AUTO SEQUENCE
L-00:05:00 Ground & On-Board Telemetry Activation
  Transfer to onboard Control
  Commander Controls activated
  Visors Closed and Air Flow Initiation
  Launch Key Inserted in Launch Bunker
L-00:03:15 Engine Nitrogen Purge
L-00:02:40 Umbilical mast power disconnected to 3rd stage
L-00:02:35 Propellant Tank Pressurization
L-00:02:30 Onboard Measurement System Activation
L-00:02:15 Propellant Tank Drain&Safety Valves closed
  LOX and N2 Loading Termination
L-00:01:00 Transfer to Internal Power
  AUTO SEQUENCER ENABLED
  First Umbilical Tower Separates from Booster
L-00:00:40 Power Umbilical to third Stage disconnected
L-00:00:20 ENGINE IGNITION (Core Stage and Boosters)
L-00:00:15 Intermediate Thrust Level
  Second umbilical Tower separated from Booster
L-00:00:10 Engine Turbopumps at Flight Speed
L-00:00:05 Full Thrust Level
L-00:00:00 Fueling Tower Retracts
  LIFTOFF
   