• Home
  • Calendar
  • ISS
    • Expedition 36
    • Expedition 35
    • ISS Mission Archive
  • MSL
    • MSL Mission Updates 6
    • MSL Science Reports
    • MSL Rover Information
    • MSL Science Instruments
    • MSL Gallery
  • Juno
    • Juno Mission Updates 2013
  • NuSTAR
    • NuSTAR Mission Updates
  • RBSP
    • RBSP Mission Updates
  • IRIS
    • IRIS Mission Updates
    • IRIS Spacecraft and Instruments
    • IRIS Mission Design
    • IRIS Science Overview
  • Commercial
    • Arianespace>
      • Ariane 5
      • Soyuz Kourou
      • Vega
    • SpaceX
    • United Launch Alliance
    • Orbital Sciences
    • International Launch Services
    • Sea Launch Missions
    • CCDev
  • Russia
  • China
  • Japan
  • Entry
    • Re-Entry May 2013
  • Other
    • Launch Vehicle Library
    • India
    • NPP
    • Shuttle Retirement Updates 3
    • Shuttle
    • SLS Orion
    • Phobos Grunt
  • Archive
  • Search
  • About
Share |
Picture

Atlas V Countdown Timeline

T- L- Event
Events 12:00 Verfiy Countdown Clock is in proper Configuration
specified at   Countdown Begins
L-12:00 and   MLP Clear of non essential personnel
L-8:30 are   Launch Pad Environmental Control System Preps
performed   Nitrogen Purge
during L-2-   Weather Briefing
Day   Search Light Power Up
operations,   SLC41 warning lights on
but can take 08:30 MLP to Launch Pad
place until   MLP Hard Down and Securing
that point to   Atlas System Start in preparation for Tanking
meet the T-0   Instrument Checks
requirement.   Lox System Preparations
    Gas Detection System Preparations
    Internal Battery Checks
    LH2 System Preparations
  10:00 Countdown Clock Initialization
  08:00 NEMO On Station
  07:45 ULA On Station
  07:30 Launch Team on Station
  07:20 Set Roadblocks
  07:15 Launch Vehicle Powerup
  07:00 5SLS on Station
  06:50 Communication Checks
  05:40 Weather Briefing
  05:15 Communication Checks
  05:15 C-Band Communication Checks
  05:05 Weather Balloon Release
  04:35 S-Band Communication Checks
  04:15 L-4HR Commanding
  04:15 Polls
  03:50 Initiation of Nitrogen Flow
  03:49 Set Spacecraft Clock
  03:15 SLC Clear of all Personnel
02:00 02:55 Launch Conducter Briefing on Vehicle Conditions
HOLDING   GO/No GO for Tanking Poll
30min Hold   Pre-Test Tanking Briefing
02:00 02:25 Centaur LOX Tank Chilldown
COUNTING 02:25 Atlas LOX Vault & MLP Chilldown
  02:25 Centaur Helium Storage Bottle Pressurization
  02:25 Atlas Pressure Vessels Charge
  02:25 Atlas V RP-1 Fuel Tank Press
01:55 02:20 Safe Arm Device Cycle Test
01:50 02:15 Centaur LOX Transfer Line Chilldown
01:43 02:08 Centaur LOX Tanking begins
01:40 02:05 Weather Balloon Release
01:33 01:58 Centaur LH2 Tank Press to Chilldown Level
01:30 01:55 Atlas V LOX Tanking begins
01:25 01:50 Centaur LOX at 75%
01:25 01:50 Centaur LH2 Transfer Lines Chilldown
01:10 01:35 Centaur Engine Chilldown
01:02 01:27 Centaur LH2 Loading
00:55 01:20 Flight Control Final Preparations for Hydraulic Press
00:45 01:10 Main Engine Pneumatic System Press to Flight Level
00:40 01:05 Heater Activation
00:40 01:05 FTS Test
00:35 01:00 FGM Activation
00:25 00:50 Load Boost Block
00:20 00:45 Fault Protection Validation
00:17 00:42 Polls for Terminal Countdown
00:16 00:41 Fuel Fill Sequence Initiation
00:15 00:40 History Data Dump
00:15 00:40 Term CT Configuration complete
00:11 00:36 Range Clear for Launch
00:10 00:35 Weather Briefing
00:07 00:32 Range Clear Poll
00:06 00:31 Spacecraft GO/No GO Poll
00:06 00:31 NAM Poll
00:06 00:31 SMD Poll
00:05 00:30 Fuel Fill Sequence Complete
00:05 00:30 Water Deluge System actuation Pressure Adjustment
00:05 00:30 Cenataur LOX at Flight Level
00:05 00:30 Centaur LH2 at Flight Level
00:04 00:14 NLM Poll
HOLDING 00:09 Launch Director Final Poll
  >>>> SAFE L-9MIN CONFIGURATION FOR EXTENDED HOLDS
Variable 00:07 Spacecraft Status Check
Hold 00:06 Spacecraft on internal Power
Planned: 00:06 LD GO to Launch
25min 00:05 Range Clear Validation
COUNTING 00:04 Hazardous Gas Monitoring Complete
00:04 00:04 Automatic Sequence Begins
00:04 00:04 Atlas LOX Replenish Terminated
00:04 00:04 Atlas LOX Tank Pressurization
00:03 00:03 Atlas Tanks at Flight Pressure
00:02 00:02 Atlas and Centaur switch to internal Power
00:01:55 00:01:55 CMD Sequence
00:01:50 00:01:50 Centaur Topping Sequence complete
00:01:30 00:01:30 Launch Control System Enabled
00:00:16 00:00:16 Launch Verification
00:00:02.7 00:00:02.7 Main Engine Start
+00:00:01.1 +00:00:01.1 Liftoff

 

Launch Date August 30, 2012
Launch Time 8:05 - 8:25 GMT
Launch Site Cape Canaveral Air Force Station
  Space Launch Complex 41
Launch Opportunities Aug. 23 through Sep. 24

Launch Vehicle

Picture
Photo: NASA Kennedy
Atlas V 401
>>>Launch Vehicle Information

Links

>>>Ascent Information 
>>>Launch Weather Forecast