• Home
  • Calendar
  • ISS
    • Expedition 36
    • Expedition 35
    • ISS Mission Archive
  • MSL
    • MSL Mission Updates 6
    • MSL Science Reports
    • MSL Rover Information
    • MSL Science Instruments
    • MSL Gallery
  • Juno
    • Juno Mission Updates 2013
  • NuSTAR
    • NuSTAR Mission Updates
  • RBSP
    • RBSP Mission Updates
  • IRIS
    • IRIS Mission Updates
    • IRIS Spacecraft and Instruments
    • IRIS Mission Design
    • IRIS Science Overview
  • Commercial
    • Arianespace>
      • Ariane 5
      • Soyuz Kourou
      • Vega
    • SpaceX
    • United Launch Alliance
    • Orbital Sciences
    • International Launch Services
    • Sea Launch Missions
    • CCDev
  • Russia
  • China
  • Japan
  • Entry
    • Re-Entry May 2013
  • Other
    • Launch Vehicle Library
    • India
    • NPP
    • Shuttle Retirement Updates 3
    • Shuttle
    • SLS Orion
    • Phobos Grunt
  • Archive
  • Search
  • About
Tweet
Picture

Countdown Timeline

Time (T-) Event
T-4:15:00 Ground Operation Checks complete
T-3:15:00 NASA Launch Team - Management on Station
T-2:20:00 Flight Crew enters L-1011 Aircraft
  Prestart Checklist (L-1011)
T-2:18:00 Engine Start Poll
T-2:10:00 GO for Engine Start
  Start Engine 2
  Start Engines 1&3
  Aircraft Hatch Closure
  Aircraft Stairs Removal
T-1:45:00 Pre-Taxi Checklist complete
  Flight Termination System Activation
  Voice Checks completed
T-1:15:00 GO for Taxi
  Taxi
T-1:03:00 Status Check
T-1:00:00 Ready for Takeoff Poll
  GO for Takeoff
  L-1011 Takeoff
  Chase Plane Takeoff
T-0:30:00 Chase Plane Visual Inspection
  Report on Turbulence, Winds, Clouds
T-0:15:00 Release Mechanism armed
T-0:12:00 Flight Termination System Verification
  Avionics to internal Power
T-0:09:00 Weather Status Report
  Weather GREEN for Launch
  Peak Power has Passed
  L-1011 on Course to Drop Point
T-0:07:00 Range Status Validation
  Transient Power on
  Verify Vehicle is safe
T-0:05:00 NASA Launch Manager - Final Status Check
  Avionics on internal Power
T-0:00:45 Fin Battery Activation
T-0:00:20 Fin Status Check
  Fin Heading Status Verification
T-0:00:10 Pilot confirms GO for Launch
T-0 Pegasus release
T+0:00:05 Pegasus Orion 50S IGNITION


Ascent Timeline and Ground Track

Time Event Altitude
T-0 Pegasus Release 11.89km
T+0:00:05 Orion 50S Ignition 11.79km
T+0:00:08 Pitch Maneuver -
T+0:01:17 First Stage Burnout 54.25km
T+0:01:30 First Stage Separation -
T+0:01:32 Orion 50 Ingition 71.63km
T+0:02:08 Payload Fairing Separation 115.21km
T+0:02:45 Second Stage Burnout 180.14km
T+0:08:55 Second Stage Separation -
T+0:09:06 Orion 38 Ignition 620.79km
T+0:10:14 Third Stage Burnout 629.68km
T+0:13:14 Spacecraft Separation -
  End of Pegasus Mission -
  L-1011 Returns to Departure Point -
Picture
Launch Date June 13, 2012
Launch Time 15:30 to 19:30 GMT
Launch Site Air Launch
  Ronald Reagan Missile Defense
  Test Site, Kwajalein Atoll
Launch Vehicle L-1011 Aircraft
  Pegasus XL


Launch Vehicle

Picture
Photo: NASA
>>> Pegasus XL Launch Vehicle Information

Launch Site

Picture
Photo: NASA

Insertion Orbit

Apogee 575 Kilometers
Perigee 600 Kilometers
Mean Altitude 587.5 Kilometers
Inclination 6°
Semi Major Axis 6,950 Kilometers
Picture
Photo: Orbital Sciences Corporation


Launch Window Opens


© 2011-13 www.spaceflight101.com - Patrick Blau
Spaceflight101 content can be shared/reproduced for non-commercial or informational purposes. Appropriate crediting is appreciated.